Oscar Shirani's Story
Mr. Oscar Shirani is a nuclear
engineer who was employed in the nuclear industry for 23 years. He started with
Commonwealth Edison, which was later taken over by Exelon, the nation's largest
nuclear utility, as a structural engineer. He has authored numerous publications
in technical trade journals, some of which have been used as codes and guidelines
by nuclear power plant manufacturers and organizations such as the American
Society of Mechanical Engineers (ASME), the Motor Operated Valve Users Group
(MUG), and American Power Conferences. He has also received numerous honors
and awards from ComEd and various trade groups and was often invited to lead
national quality assurance trainings for other nuclear industry inspectors.
Besides serving as senior
lead quality assurance inspector for ComEd and Exelon for most of the 1990s,
Mr. Shirani also performed that function for coalitions of nuclear utilities,
such as the Nuclear Users Procurement Issues Committee, or NUPIC. Mr. Shirani
was selected a number of times by NUPIC to lead quality assurance inspections
of Holtec dry casks, which are certified by the NRC to both store and transport
irradiated nuclear fuel, or high-level waste, across the country.
Holtec International, based
in Marlton, New Jersey makes dry casks are to be used for storing high-level
waste at thirty-three of the nation's nuclear power plants, including Indian
Point in New York, Quad Cities and Dresden in Illinois. According to the company's
website, they plan to being loading spent fuel into Holtec dry casks at PSEG's
Hope Creek reactor at the Salem site starting in 2006. These casks are also
designed to transport spent fuel on the country's rail lines and public roads,
where up to 50 million people live within half a mile. Faulty containers increase
the likelihood of a nuclear accident at any of those places.
Mr. Shirani and his team
found so many design, manufacturing, and regulatory code violations with the
Holtec dry casks that in May 2000, he recommended that Exelon issue a Stop Work
Order to force the company to correct its faulty practices. Shirani was particularly
concerned about defective welds on the casks that would be weakened by heat-related
stress. Mr. Shirani was already in trouble with ComEd because of an earlier
Stop Work Order he issued against General Electric Nuclear Engineering (GENE)
because of more than 50 design, safety system, and safety parts violations in
GE Boiling Water Reactors, which make up about one-third of the nation's fleet
of nuclear power reactors.
Shirani told ComEd managers
that if they didn't issue the Stop Work Order to Holtec and then used the casks,
Exelon would be liable if there was ever an accident. ComEd issued the Stop
Work Order and soon after, Jim Gill, Chairman of the Dry Cask Quality Group,
requested that ComEd send Shirani to conduct a utility-wide audit, especially
because ComEd's Dresden reactors were going to be the first to use the casks.
When Shirani told his superior,
Russ Bastyr, Manager of ComEd's Supply Evaluation Services, about the request,
Bastyr told him not to go, stating that they only audit companies every two
to three years. Shirani then went to Paul Planning, Director of Dry Casks at
the Dresden plants, who also had concerns about Holtec. Planning convinced ComEd
managers to send Shirani to conduct the audit, and Shirani took four of the
company's best engineers with him.
On the first day of the
audit, June 19, 2000, they found major design and welding issues and told Holtec
that the findings didn't look good and that in fact it appeared the company
was violating NRC design regulations. On the second day of the audit, June 20,
2000, Tom Joyce, the Vice President of Supply for ComEd, told Shirani to leave
the audit and fly to Philadelphia to interview for a position as the Vice President
of Supply for Enterprise, ComEd's non-nuclear division. When Shirani told Joyce
that he was in the middle of conducting an audit, Joyce said that he was required
to go to the interview. With great reluctance, Shirani went to the interview.
His interviewer, Honorio Pavron, was two hours late and promptly told Shirani
that his resume didn't fit the experience the job required.
When Shirani got back to
the audit on June 21, the engineers from Southern Nuclear and New York power
had left and the experts from ComEd had been transferred back to the field.
He was left with three auditors who had with little to no welding experience.
Shirani then extended the audit to the following week, went back to the site
with the two welding engineers he originally selected, and found nine significant
findings with the Holtec casks.
Shirani returned to Illinois
on July 7 and issued his final audit report on August 4. During that time, Shirani
had two job interviews-jobs for which Bastyr recommended him. Shirani was shocked
to find out that one of the jobs was Bastyr's-the Manager of Supply Evaluation
Services. The other job was not in ComEd's nuclear division. When Shirani interviewed
for Bastyr's job, he interviewed with Tony Broccolo, Bastyr's good friend. Instead
of interviewing Shirani about his professional experience, Broccolo asked Shirani
to recall his recent disagreements with Bastyr so that they were properly documented.
On August 4, Shirani submitted
his final audit report. He also told Bastyr that he needed to conduct a follow
up audit that other utilities were asking for. Basyter told him there was no
budget for a follow up audit.
At the same time Shirani
submitted his audit on Holtec, ComEd was finalizing the merger with PSEG. Exelon,
the new name for the merged utilities, distributed a company-wide email informing
staff that they could apply for numerous merger-related job openings between
August 4 and August 17. Shirani asked Bastyr to nominate him for two positions.
On August 17 and during September, Shirani wrote Bastyr three reminding him,
but Bastyr never responded.
It is important to note
that during this time, the supervisor of an anonymous manager at Exelon's Byron
plant, who had previously raised concerns about safety culture at the plant,
requested his supervisor to nominate him for a new position on August 18. His
supervisor refused to nominate him and he was terminated two months later. He
then filed a whistleblower complaint to the NRC. Since he was clearly in the
right, and Exelon admitted the harassment and agreed to a series of surveys
and trainings they said would improve safety culture at the plant. Since Exelon
was proactive in this case, the NRC did not issue any violations.
However, when the NRC investigated
Shirani's complaints, they didn't take it as seriously since he wasn't actually
terminated. In the end, the NRC accepted the excuse that the time period for
nominating an employee for a new position in the merged company had expired.
This is a blatant double standard, since the employee at the Byron plant requested
nomination on August 18 and Shirani requested nomination a day earlier, on August
17.
On November 29, 30 and 31,
Holtec hosted a utility-wide users group meeting. Shirani never received the
invite, but when he heard about it from a co-worker, he changed his flight from
a vacation in Brazil to attend. After Dr. Ross Landsman of the NRC's Region
III Decommissioning Branch asking the company some probing questions, Shirani
got on the speakerphone and summarized his findings to the audience and explained
how Exelon wouldn't let him finish the audit. After he spoke, Landsman approached
him, telling him there weren't many people like him left in the industry. Landsman
also said that he was never told about Shirani's audit, even though Landsman
is in charge of all the dry casks in the Midwest.
After Shirani's conversation
with Landsman, Dr. Kris Singh, Holtec's President and CEO approached him. Singh
told Shirani not to send Landsman the audit and that it would ruin Exelon. Singh
also offered Shirani a six-figure job at Holtec. Shirani refused the offer.
The following day, Landsman told Shirani that at dinner the night of November
30, Singh also approached Landsman, telling him to leave the NRC to come work
for Holtec. Landsman also refused the offer.
When Shirani returned to
work on December 1 and told Bastyr about his conversation with Landsman, Bastyr
told Shirani not to send the audit. Shirani then told Bastyr that if he couldn't
send the audit through Exelon, then he would hand deliver it to Landsman.
After Shirani went back and forth with different levels of management and being
belittled and cursed at several times, Exelon sent a censored audit to Landsman
on December 13. In the letter, Exelon wrote that as per their discussion over
the phone, the information was proprietary and was not to be disclosed to the
public. Although Shirani didn't know it at the time, Exelon altered the conclusion
of his August 4 report, stating that the findings had been resolved. Shirani
discovered this falsification when he saw the document at Department of Labor
hearings in 2002.
However, before the letter
was sent to Landsman, Shirani got a call from Ruth Ann Gillis, Senior Vice President
of Exelon's finance division and Executive Sponsor of Exelon's Asian-American
employees. Shirani was a leader in the Asian-American group, so he knew Gillis
even though she was not in the nuclear division. Gillis called Shirani on December
7 and asked told him she needed to see him in Chicago immediately. Asir Dasilva,
Vice President of Diversity, also called him to request a meeting with him the
same day.
When Shirani met with Dasilva,
Dasilva discouraged him from taking a position as a Diversity Manager in Exelon's
nuclear division, a position Shirani had applied for in October. Right after
the meeting with Dasilva, Shirani met with Gillis, who told him that Exelon
wanted to hire him as a tax manager in the financial division doing financial
audits. Shirani replied with concern, telling her that he had no financial experience
or education. Gillis told him not to worry and that they would give him six
to nine months of training through Arthur Anderson. Gillis also told him that
he was in the line of fire at the nuclear division and that he didn't have a
chance of moving up the chain of command if he stayed there.
Shirani told Gillis he would
think about the financial job, but never applied. Gillis recommended Shirani
for the position of Principal Auditor Level E4 anyway, with an $8,000 salary
increase.
A week later, on December
19, Gillis called Shirani in the evening. After talking for half an hour, Gillis
persuaded him to take the job. To cover her tracks, Gilis then told Shirani
he needed to call Rich Landy, Vice President of Human Resources in the nuclear
division, and tell Landy he was accepting a different job in the financial division.
The next day, on December
20, Shirani received an email from Jon Rowe, Exelon CEO, congratulating him
on his new position. Shirani was surprised to get a personal email from Rowe,
a man in charge of 28,000 employees and 150 vice presidents, congratulating
him for a position that didn't even include managerial responsibility.
Shirani started the new
job in Philadelphia on January 15, 2001. Two days later, on January 17, Landsman
sent a memo to Bruce Jorgensen, NRC Chief of the Region III Decommissioning
Branch, citing serious concerns with Holtec dry casks and emphasizing Shirani's
audit. He wrote, "during discussions [at the Holtec Users Group Meeting in November
2000], a ComEd QA auditor [Shirani] indicated that U.S. Tool & Die (the fabricator
of the Holtec casks) appears to have a broken corrective action system. I just
received a copy of the audit and discovered that the corrective action system
wasn't the worst thing broken." Landsman proceeded to summarize Shirani's audit,
noting that "the audit was done in June-July 2000, and still the issues are
not resolved. Worse yet, I just discovered that the Audit Team Leader [Shirani]
is being moved sideways on site, out of the audit group. These findings will
be dropped." Landsman concluded that "This audit indicates that in no way do
they [Exelon] meet our Region III requirements in implementation of the program.
Cost and scheduling are controlling the work."
On January 29, Landsman
called Shirani, after discovering that Shirani had moved to the financial division.
Landsman told Shirani he was worried about him, that he guessed Exelon managers
had tricked Shirani into agreeing to be transferred out of the nuclear division--common
industry practice for potential whistleblowers.
Landsman was able to postpone
the loading of the dry casks at Dresden for several months, but his concerns
were eventually overridden by the NRC Nuclear Reactor Regulations division-the
same agency that failed to identify problems with the cask in the first place.
The NRC has sat on the issue since. Landsman refused to sign NRC papers permitting
the loading of the casks, but the NRC has allowed the loading to occur anyway.
Now, the same Holtec dry casks are in use at 33 reactors around the country.
Between January and April
2001, Shirani worked hard at his new job, but never got the training Gillis
had promised. In April, Ellen Caya came in as Vice President of Exelon's financial
auditing division. In May, Caya went to lunch with Shirani. Shirani told her
about all of his troubles in the nuclear division. Caya then told him she couldn't
use him in the financial department, as the job didn't fit his background. She
told him that his position requires eight to fifteen years of experience and
a CPA license and encouraged Shirani to get a job somewhere else.
On July 19, Caya's first
written evaluation of Shirani said he was a diligent, hard worker. Shirani told
Gillis about the evaluation, and two days later, Gillis met with Shirani and
Caya, telling Caya to apologize to Shirani and to keep him on staff.
In September, Shirani and
a few others in the auditing division were required to re-apply for their positions
due to re-organization connected to the merger. When Caya wrote to him that
he needed to have the eight to fifteen years of experience required to keep
his position, Shirani got nervous. Shirani couldn't even apply for a demoted
position as a financial auditor, as it also required four to six years of experience.
He told Martha Garza, Manager of Ethics and Diversity in Exelon's Human Resources
department about his concerns, Garza told him not to worry.
In October, Arthur Anderson evaluation of Shirani contradicted Caya's earlier
review. Soon after the evaluation, Dasilva and Elieter Palacio, Director of
Ethics at Exelon met with Shirani. They told him they didn't want him back in
the nuclear division, that they weren't happy with him in the financial division,
concluding that he should leave the company altogether.
On October 22, Caya told
Shirani he wasn't qualified for his position, as it was changing from principal
auditor to principal manager, and he was fired. At court proceedings through
the Department of Labor, the official letter changing the name of Shirani's
position from auditor to manager was dated on October 26, after Shirani had
already left staff.
According to NRC whistleblower
regulations, a former employee has 180 days after leaving their job to file
a complaint of wrongful termination. Since Shirani's complaints were related
to his job in the nuclear division, but he stayed in the financial division
until October 2001, the 180 day deadline had passed by the time he made a formal
complaint to the NRC on November 31, 2001. The NRC's Office of Inspector General
ruled that Shirani didn't tell the NRC until November 31, 2001, but Shirani
contends that he made his concerns clear to the NRC a year earlier, on November
30, 2000 when he spoke with Landsman.
Shirani's case is currently
in the appeals court of the Department of Labor. Shirani has since applied for
engineering jobs at several nuclear facilities, but feels he has been blackballed
from the industry, even here in New Jersey. In December 2003, Shirani applied
for a job at PSEG's Salem plant. In January, Francis Albert, who works for Aerotek,
the company that handles staffing for PSEG, called him and flew him out for
an interview. At the meeting, Albert and three other PSEG managers told Shirani
he had more knowledge about dry casks than anyone else and hired him on the
spot. Two days later, Albert sent Shirani and email telling him that Ken Fleischer,
a former ComEd electrical engineer, said to say hello. The next day, Shirani
called Albert to finalize the details, and Albert hung up the phone. Shirani
called and emailed Albert but never received a response.